Economizer coils, Tubes and seamless
pipe for Boiler 1V-4035T (RMA 337/14)
• QA/QC PLAN, WPS & WELDER QUALIFICATION AND THE FABRICATION
DRAWINGS SHALL BE SUBMITTED FOR CPC APPROVAL BEFORE COMMENCING THE PRODUCTION
AND THE MANUFACTURING SHALL BEGIN ONLY AFTER RECEIVING CPC APPROVALS IN
WRITING.
• DIMENSIONAL ACCURACY OF PRODUCTS SHOULD BE CERTIFIED BY THIRD
PARTY INSPECTOR AND CERTIFICATES SHOULD BE SENT TO CPC BEFORE DISPATCH THE
ITEMS.
• MILL TEST CERTIFICATES IN ACCORDANCE WITH EN 102304 3.2, NDT CERTIFICATES
AND THIRD PARTY INSPECTION REPORTS SHOULD BE SENT BEFORE SHIPMENT FOR CPC
APPROVAL.
• THIRD PARTY INSPECTORS SHOULD BE ONE OF THE FOLLOWING
INSTITUTIONS.
(A). LLOYDS (B). SGS (C). BV (D). ABS (E). TUV
* IN ADDITION TO THE ABOVE THIRD PARTY INSPECTION, CPC SHALL BE
ALLOWED TO WITNESS THE TESTS, PROCEDURES AND PERFORM INSPECTION AT THE
MANUFACTURING SITE FOR MINIMUM OF TWO CONSECUTIVE DAYS BY TWO MECHANICAL
ENGINEERS NOMINATED BY CPC.
* ALL THE EXPENSES RELATED TO THE INSPECTION VISIT FOR TWO
MACHANICAL ENGINEERS NOMINATED BY CPC SHOULD BE BORNE BY YOU.-EXCEPT THE COST
OF AIR TICKETS TO THE CLOSEST INTERNATIONAL AIR PORT).
* THE PROPER AND REASONABLE FACILITIES COVERING FOOD,
ACCOMMODATION, INLAND TRAVELING FOR EXAMININING, INSPECTION, TESTING AND
GUAGING SUCH ITEMS SHOULD BE SUPPLIED AT FREE OF CHARGE. THE APPARATUS,
MATERIALS, TOOLS, GAUGES, LABOUR & ASSIATANCE AS MAY BE REQUIRED FROM TIME
TO TIME FOR THE PURPOSE OF SUCH EXAMINATIONS, INSPECTION, TESTING & GAUGING
SHOULD BE PROVIDED AT FREE OF CHARGE.
• DISPATCH OF ECONOMIZER COIL SHOULD BE DONE ONLY AFTER RECIEPT OF
THE APPROVAL FROM CPC TO THE THIRD PARTY INSPECTION REPORTS.
• EACH COIL SHOULD BE HYDROTESTED & WITNESSED BY BOTH THIRD
PARTY INSPECTOR & CPC REPRESENTATIVES & ALSO CERTIFIED BY THE THIRD
PARTY INSPECTOR INCLUDING REVIEWING OF NDT CERTIFICATES.
** Awaiting draft LC acceptance on 26.08.2014